Have a question?
Ask our expert directly.
István Zsolt Benkó
Lead Public Procurement Expert
Electronic Public Procurement System
A procurement procedure must be conducted in the EKR. This page covers the handful of questions the official documentation answers least well: what it costs, when the deadline actually expires, and what happens when the system is unavailable.
The EKR (Elektronikus Közbeszerzési Rendszer) is the state system at ekr.gov.hu through which Hungarian public procurement procedures are conducted. It is operated by Új Világ Nonprofit Szolgáltató Kft., with the Nemzeti Fejlesztési Központ as professional owner. The detailed rules are set out in Government Decree 424/2017. (XII. 19.).
The main rule is short. Under the Public Procurement Act (Kbt., Act CXLIII of 2015) 40. § (1) a procurement or concession procedure must be conducted using the EKR, and under 41. § (1) every declaration and item of information passing between the contracting authority and economic operators must be in writing, by electronic means.
The exceptions are frequently misquoted, so they are worth separating:
One citation worth checking. Points e) and f) of Kbt. 41/C. § (1) have been repealed and stand empty in the consolidated text. Running a procedure on paper because of a prolonged outage therefore no longer rests on that ground. This is not an academic point: the official EKR FAQ and the operator's own fee refund notice both still cite point e).
The fee is paid by the contracting authority, per initiated procedure. The decree states only the net amount, but what is actually transferred is the gross figure. That gap is where most outdated summaries go wrong.
Legislative status verified on 28 September 2026.
| Case | Gross | Net and VAT |
|---|---|---|
| Procedure conducted in the EKR | HUF 50,800 | HUF 40,000 + 10,800 |
| Call-off under a framework agreed outside the EKR | HUF 12,700 | HUF 10,000 + 2,700 |
| Retrospective publication after a procedure run outside the EKR | HUF 12,700 | HUF 10,000 + 2,700 |
| Waiver under Kbt. 31. § (5) or because of a published outage | HUF 0 | none |
The fee depends on where the procedure was conducted and on whether it is a framework call-off. The procedure type, the regime and the estimated value make no difference: the base case is payable at a single uniform rate in the words of Ministerial Decree 40/2017. (XII. 27.) MvM, so it is the same in the national and the EU regime. The waiver applies only to the retrospective publication fee, and a refund of a fee already paid has to be requested separately.
The fee may be paid only by bank transfer, to the account of the EKR operator. There is a single formal requirement, and it is the one most transfers fail: the reference field must carry the EKR identifier of the procedure. The operator asks that no special characters accompany it.
If a transfer cannot be identified, the system does not attach it to the procedure. The procedure then cannot proceed, the operator returns the amount within fifteen days, and the fee has to be paid again with the correct identifier.
We deliberately do not reproduce the account number here. Copying another organisation's bank details and maintaining a second copy of them is needless risk: if the operator changes them, a transfer made from a stale copy goes to the wrong place and the procedure stalls. The figures are worth copying from the operator's own page every time: rendszerhasználati díj.
When it must be paid. Under section 1/A (4) the fee must be paid by the time the initiating notice is sent in the EKR: for procedures started by notice, by the time it is dispatched to the Public Procurement Authority, and for those started without a notice, by the time it is sent to the economic operators. What counts is the day the amount is credited to the account, so initiating the transfer is not enough.
Where the fee has not been paid, or not in the prescribed amount, the operator is entitled under section 1/B (1) to prevent the procedure from starting. The sole exception is a negotiated procedure without prior publication launched on grounds of extreme urgency.
Section 1/C provides for repayment within fifteen days in three cases: where the authority withdraws the initiating notice before publication and evidences this to the operator, where an administrative error caused the fee to be paid twice, and in the prolonged outage case.
The request must be signed in company form and sent by post or through cégkapu. The operator states expressly that it cannot act on requests sent by e-mail. It issues neither pro forma invoices nor advance payment requests.
These rules were rewritten by two separate amendments to Government Decree 424/2017. (XII. 19.), and the two dates do not coincide. The deadline window and the timing of the opening were set by Government Decree 427/2024. (XII. 23.) with effect from 1 March 2025. The rule that no tender can be submitted at all after the deadline expires came later, from section 9 of Government Decree 371/2025. (XI. 28.), with effect from 2 December 2025. Under section 35 (14) the latter applies to procedures already under way at that date. Most EKR summaries online still give the earlier text.
| Question | The rule in force |
|---|---|
| When may the tender or participation deadline be set? | On a working day, at a time between nine in the morning and four in the afternoon. |
| When does the opening begin? | Sixty minutes after the deadline expires. |
| Can a tender be submitted after the deadline? | No. The tender must arrive electronically by the expiry of the deadline, the EKR confirms the time of arrival, and after expiry no tender can be submitted in the EKR. |
| Can the opening be repeated? | No, section 5/B rules it out. |
A contradiction worth knowing about. The official EKR FAQ still states: "Once 24 hours have elapsed after the tender deadline, not even a late tender can be submitted in the EKR." That sentence implies a late tender can still be submitted for twenty-four hours after the deadline. The text of section 15 (3) in force says otherwise. Anyone relying on the FAQ assumes room for manoeuvre that does not exist.
Section 16 of Decree 424/2017 governs what happens when the system is unavailable. The consequence is serious: in the listed cases the deadline does not expire, and the contracting authority must extend it.
The length of the extension is set by section 16 (4): it must leave adequate time, but at least two days from the notification of the extension where no amendment notice is required, apart from a negotiated procedure without prior publication, four days where the notice is published in the Hungarian Public Procurement Bulletin, and six days where it goes to the Official Journal of the European Union.
Not every fault is the same. Section 22 of the decree distinguishes three states. An üzemszünet is planned, published maintenance. An üzemzavar is unplanned and means the EKR is only partly operable. A működési hiba is an individual fault arising in a given procedure that prevents a procedural step from being taken. The deadline rule above rests on section 22 (2) and (3), that is on the üzemzavar and the működési hiba. Planned maintenance announced in advance does not fall under it and has to be allowed for when the deadline is set. Section 22 (4) further provides that a fault arising solely within the contracting authority's or the economic operator's own sphere is not a működési hiba, so a problem with your own connection or browser does not push the deadline back.
Where the outage affects the opening rather than the deadline, section 16 (5) requires the EKR to carry out the opening immediately after service is restored.
The operator publishes current and closed outages on its own site rather than on ekr.gov.hu: scheduled and unscheduled outages. Section 16 refers to that publication, which makes it the primary evidence in any dispute over a deadline.
Under section 6 (1) of Decree 424/2017, using the EKR requires registration, and registration is unified: the same natural or legal person may hold only one.
What the official documentation does not state. The portal user manual (v3.19.1) walks through registration field by field, but nowhere records the point that matters most to a foreign or first-time economic operator: EKR registration requires no Ügyfélkapu, no KAÜ authentication, no AVDH and no qualified electronic signature. Login is by username and password. This is consistent with Kbt. 41/A. §, which does not permit a contracting authority to require a qualified electronic signature as a general matter.
Contracting authorities are in a different position: under section 6 (2) the registration and data amendment of a contracting authority organisation is subject to approval by the Public Procurement Authority. No such approval applies to economic operators.
One terminological point that older summaries consistently get wrong: the adviser register is now called ÁKSZ (state public procurement adviser). FAKSZ has ceased to exist as a legal institution, so the phrase "FAKSZ registration" does not describe the current system.
| Action | Contracting authority | Economic operator |
|---|---|---|
| Organisation registration | Subject to Public Procurement Authority approval | No approval required |
| System usage fee | Pays, per procedure | Pays nothing |
| Creating a procedure, sending the notice | Yes | No |
| Submitting a tender or request to participate | No | Yes |
| Rectification notice | Issues it | Responds to it |
| Access to the procurement documents | Publishes them | Yes, even without registration |
| Searching notices in the procedure archive | Yes | Yes, even without registration |
| Requesting alerts on new notices | Yes | Yes, even without registration |
Alerts differ from user expectations in two respects: they can be requested without registration, by giving an e-mail address, and they expire after two months. The system sends reminders before expiry, but failing to renew silently ends the alerts.
Creating a procedure also carries a deadline that is easy to overlook: under section 5/A the contracting authority may send the initiating notice for publication, or in a procedure without a notice the invitation to tender or to negotiate, within one year of creating the procedure in the EKR.
The official EKR support materials are published on the support page. It currently links thirteen manuals, set out below. The figures are as at 28 September 2026. The manuals are under copyright, so we link to them rather than reproduce their content.
| Manual | What it covers | Version | Length |
|---|---|---|---|
| Volume II, contracting authority | The full set of procedural actions on the authority side | 3.0 | 640 pages |
| Volume II, tenderer | The same on the tenderer side | 2.18.3 | 167 pages |
| Portal | The surface available without logging in, the registers and the procedure archive | 3.19.1 | 316 pages |
| eForms | Completing the EU notice templates | 3.0 | 213 pages |
| Manual | What it covers | Version | Length |
|---|---|---|---|
| Electronic auction, contracting authority | Preparing and running an electronic auction | 3.0 | 48 pages |
| Electronic auction, tenderer | Taking part in the auction | 3.0 | 29 pages |
| Preliminary market consultation | Advertising and running the consultation in the EKR | 2.19.1 | 75 pages |
| Contract manager and public contract register | Publishing contracts and their modifications | 2.10.3 | 59 pages |
| eSzámla | Format validation of the electronic invoice | 1.4 | 14 pages |
| Volume IV, below-threshold purchases | Handling purchases below the procurement threshold | V3 | 139 pages |
| Support functions | User and permission management, organisation data | 2.12 | 90 pages |
| Kbt. 111. § w) | Purchases under Kbt. 111. § w) | not stated | 90 pages |
| Exporting award notice data | Field dictionary for the open data exports | 12 | 242 pages |
Four things are worth knowing before relying on any of them:
Helpdesk: +36 1 465 8899, working days between 8am and 4pm, or ugyfelszolgalat@ujvilag.gov.hu. For questions of procurement law they give ekr@nfk.gov.hu.
The system will tell you a field is empty. It will not tell you whether the procedure is sound. Choose the side you are on.
Have a question?
Ask our expert directly.
István Zsolt Benkó
Lead Public Procurement Expert
No. Under Kbt. 40. § (2) it is the contracting authority that pays a statutory fee for using the EKR. Under section 1/A (1) of Ministerial Decree 40/2017. (XII. 27.) MvM the fee is payable per initiated procurement or concession procedure.
Registration and tendering by an economic operator are free of charge. This is one of the most common misunderstandings about the EKR.
Under the text of section 15 (3) of Government Decree 424/2017. (XII. 19.) in force, no: the tender must arrive electronically by the expiry of the deadline, and after expiry no tender can be submitted in the EKR.
Under section 16 (1) of Decree 424/2017 the deadline does not expire where the EKR is continuously unavailable for at least twenty-four hours at any point before the deadline during the tendering phase, where the outage persists continuously for at least five minutes within the final sixty minutes, or where it exists at the moment of expiry.
No. The EKR uses its own username and password authentication, and registration requires no Ügyfélkapu, KAÜ authentication, AVDH or qualified electronic signature. Section 6 (1) of Decree 424/2017 requires only that use be preceded by registration and that one person may hold only one.
Two months. This too is an operator setting, as at 28 September 2026. Alerts can be requested without registration by giving an e-mail address, and the system sends a reminder before expiry.
Failing to renew produces no error, the alerts simply stop. Where monitoring notices matters commercially, that silent expiry is the point at which it is worth building a reminder into your own process.
The maximum size of a single uploaded document is currently 25 MB. The system will not accept anything larger. This is an operator setting rather than a statutory limit, and it reflects the official FAQ as it stood on 28 September 2026.
A link or another file transfer service cannot be substituted for the upload. The tender itself has to arrive in the EKR, and a reference to external storage does not satisfy that. With bulky technical documentation this needs to be planned for when the tender is assembled, not in the hour before the deadline.